Anti-bacterial reactions are growing
]]14 April 2011 Ntvmsnbc
The Japanese and Indians who have experienced in the Fukushima Nuclear Power Plant... [[T][4][[T]]
[ Fukumaa Nuclear Power Plant has been controlled by one month, but the Japanese recognized by the serenity. It spreads nuclear protests in the country. After 11 March 9.0 cleaning and giant tsunaminin, thousands of Japanese, who are not able to control a kind of destruction in Fukuşima Nuclear Power Plant, the power company Tepco was held in front of the central building in Tokyo. In the show that the motto “Nükleere no” has increased, they wanted to close the Hamakoa Nuclear Power Plant, which was experienced in the fay line, large produce cleaner. Japan’s reactions have risen from India while they continue. According to the news of Deutsche Welle Turkish, Despite the catastrophic in Fukuşima, India does not think to remove nuclear energy plans into the shelf. The response of the public is changing every day. Mixed in the Ja regionitapur, it reacts to the nuclear power plant plan to be installed. said that the State Nuclear Energy Institution in India Acquires in Jaitapur or to the large space. The only signs that the world’s largest nuclear power plant will be built here, small few construction sites and a sign. The facility’s production capacity is planned to be more than six largest nuclear plants in Germany. The most interested about the energy counters of the energy, Jaitapur is on a steambird. The region was renovated in 2009. However, the problem of living in Jaitapur are limited to push Tags. An important part of regional abuse is fishing and pulls from the bottom of the ecological system of hot water, which will take the sea from the plant. The trick of Jaitapur is angry. The showers say that "H Spitmet Jaitapur is aiming to bring to a modern energy center, but in fact, Jaitapur converts to a new Fukuşima." The Prime Minister of India Manmohan Singh is trying to calm the public. Singh, who says that the public encounters their concerns, therefore, states that the government has to track a transparent policy as possible. India Prime Minister, which saves the safety of 20 nuclear reactors in the activity, also says that the Nuclear Supervisory Authority will nose green light to build new reactors if it is applied to solid safety conditions, and it will also apply for imported technologies from abroad. Singh's project Jaitapur, where the stent here. The tender of this giant project was one of the largest examples of the French state, the giant nuclear energy company has won Areva, more than nine billion dollars for the construction of the first two reactors. Areva's nuclear power protects its uncertainty or when it can build. In accordance with the current planning, Jaitapur target to start to produce electricity in 2018. However, the plans of Areva of busy protests are alive to be the bottom. Also many land owners in the do not have to sell the necessary land for construction. The author is now trying to reach their goal by offering high prices. They also offer doubled the fee they offer. [
]However protests for the project in India are growing disabilities. It is estimated that the protests at the end of the last week in Jaitapur joins 50 thousand of the protests. Even in New Delhi, which is located in thousands of kilometers from Mumbai and thousands of kilometers, lies into numerous spectacle streets. Pankarts “I never think more, I never fancy Fukuşima” slogans. One of the showers was Vinuta Gopal from the Indian branch of the environmental organization Greenpeace. The environmental guarder says that the message they want to give to the Gopal government is to reconcile and think of of nuclear energy plans after they live in Fukuşima, as well as against the nuclear power plant, plans to be built in Jaitapur, said that they collected 70 thousand signatures to consolidate the Prime Minister. [
Source: News