"Ecosystem Setting" for Energy and Mining Investments
3 According to September 2013 Energy World
]"Ekosystem Evaluation Communiqué, the demand of energy and mining activities in some areas protected and determined will not be renewed.
According to the draft study by the Ministry of Forest and Water Works, in the areas of absolute protection of protected areas, in planning phase, and in the protected areas where the plan is not accessible, thanks to the protection of types and examples are set, the plan and project will be built in areas where there are also m or pond bodies are built in the areas of the safety of existing dam and pond structures, the existing dam and ponds in the areas of the operation and artificial springs, such as drinking water, drinking water, water, water, water, water, water, etc.reverse) uThe drinking water until the return of special clearance on the obstacles will not evaluate the demands of energy and mining activity in absolute and short distance protection areas. [[
]]Source: News