13 Climate Action

See ‘Istanbul’ ’

See ‘Istanbul’ ’
13

17.02. 2009 NTVMSNBC

[

1/100 thousand-scale Environmental Layout Plan, marked by Istanbul’s ‘anayasa’, was accepted in the Metropolitan Municipal Assembly, but thezimal chambers plan kept the criticism blinking. The municipality responded to “Plan is much more difficult.”

[[T]]The main reference for all investment decisions and planning to be held in Istanbul will be 1/100 thousand scale Istanbul Environment Layout Plan was adopted in response to criticisms. Professional rooms during the preparation of the plan, and the offer and criticism are not into account. The criticized water raftings and the danger of the forest areas is concentrated in the direction of the decision by the government. Another issue that has been made to accept apar topar before the local Orthodox of the plan. [[[T]] [T][17]]Plan brings what]

]]

The center of the city, which is located in Beşiktaş and Beyoğlu districts in the plan, is known as a business area (MIA). istanbul.directory - Üsküdar In districts of the eastern and western ends of the city, shooting centers are predicted.

[Plan details

[

]Istanbul Environment Layout Plans some projects that have reported the central government. Accordingly, the Central Bank is located in the sector of Ataşehir Finance Center project, which stands out in the conversations of transportation to Istanbul. The Kartal urban transformation project, which is announced when taking the planned of the plan, is also included in the new port project in Hyderabad Transformation Project and Zeytinburnu (Zeyport). The third airport in 2006 and was cancelled in 2008, is included in the project. Tags. Silivri designated place for the new airport... Earlier, two new areas in the Small Drawer, thought of the transportation of Istanbul University, were as a university area. There is no decision to make the third bridge in the plan.

]]]Previous plan canceled

The plan is the result of a long and controversial process... Earlier, Istanbul Metropolitan Planning And Urban Design Center (IMP) was experienced in BİMTAŞ for Istanbul Environment Layout Plan and was spent for the renovation of the plan. Meetings were held in 2006 and the plan was born in 2006. However, the rooms and non-grant organizations were ignored and not accompanied by the plan, they resorted to the court with the reasons for which the plan was against the public benefit and the preparation and placement of the plan. 2. The Residence Court canceled the plan in May 2008. However the decision was given a decision to the content as it was received in the direction of the procedure. After the court decision, a new plan was with some changes compared to the old plan. This revised plan was approved on 13 February.

During the preparation of the plan, meetings were held with busy rooms and non-country organizations. However, the rooms count that these meetings are made to show, their reviews are not taken and the criticism they do from the context.. The municipality also argues that the necessary amendments are made in the context, sensitive to the environment and created a plan to wealth of Istanbul.

Erhan Demirdizen (City Planers President of Istanbul Branch)

The Constitution of Istanbul]]

]

Environmental Layout Plan is a general plan with the residential areas of Istanbul, industrial areas, infrastructure, roads, transportation, water supplies, water reserves and all these decisions. If we are talking about Istanbul, what we discuss, what we dream, what if we have our project and expectations, we want to invest in which we live in the city, if they live in what problems they live in, who is the plan that corresponds to what they dream. We are talking about a basic document that is the basic guide and reference to everyon Home. We call it ‘Istanbul’. It’s an important topic. [

We have supported the... [

If we look at the Chamber of Urban Planers, we thought that a comprehensive project was designed for Istanbul first as the room announced to make new plan. Many colleagues and rooms members will be included in this study. For these reasons, we were very positive at first and we were very hopeful from the process. But later, the review has shown that in terms of managers are completely unsupervised, from all types of conversations, from all Sort of interviews, no queries, conversations and interviews have turned into an unexpected place that does not host within the structure.

] We have logic to see our work

]]] [email protected]

There are groups working in the framework of a special authority, but there are zoning operations in both the government and the Metropolitan Municipality of Istanbul. The Prime Minister made explanations about the third bridge while walking the planning process, if voted, then the Environmental Layout Plan had received the final state. It was also possible that the third bridge will not be when the plan is resulted. This plan has started to grow the prototype of the structurels in aside, according to to our business. [

[

In addition to this, it will be remembered when you are prepared the cancellation plan, so many important spotlightual projects such as Galataport, Haydarpaşa Port and Dubai Towers have come to hunger. However, life continues in Istanbul. Investments or major transport decisions are random. So we had serious troubles about the content of the plan. We found the plan more flexible. [

Water spans and blocks

]]

As well as our most important criticisms were about 2-B and forest areas with the water of Istanbul. 2-A final decision was taken in the fields of water. It is necessary to make a decision on this in the high-end plan, no matter how a process will experience, how a method will be used.

In the middle of the water problem that Istanbul lives. It is necessary to protect the water from Istanbul. There is always a certain amount of relaxation in Istanbul, but Istanbul cannot use these waters as drinking water. There are four muchievous rainfalls of water that needs Istanbul. The city rains over 3 billion cubicles, but if you browse to misconceptions to water collection, this water does not come, steams, ferries in wrong places or leads to misplaces. Of course, it is not allowed to be done directly in water collection. But water collections were expected to be structured very closely. We are not able to check everything in Istanbul. Today you have opened the front of unplanned structures with mevzi plans that will develop from the next time you open a place that is not within one of the water. The decisions are related to water turquoise and snacks are ventilated to larger scale plans. [[

]] Attention to Hadımköy]

]

Can tell you that there are some reasonable improvements in the new plan Home. If we accept TEM highway as a limit, the new plan is trying to bring some restricted in the fields of agriculture and abroad in the north of the TEM highway of the city. This is a recovery according to the old plan. But we do not see the same lies in the Hadımköy region, which is very important for Istanbul. Hadımköy is a very critical area for both forest areas and water collection. The water collection, which must be protected on both sides of Hadımköy, under a large separation of water collection, which should not be opened. [

]

] The decision of the new airport ministry

]

In addition to this, there is also a third airport. There was no third airport in the old age. This is not a result of the work draw out by DLH (Demiryollar, Ports, and General Directorate of Construction of Air Squares), Istanbul Environment Layout Plan works, Istanbul city. Currently, it is known to everyone who has a lack of capacity at Atatürk Airport. But ‘the solution is the third airport’ and suggest it in the middle of agricultural areas in Silivri, or is it the re-review of Atatürk airport capacity and the capacity of Sabiha Gökçen? It is home to be bathe in Istanbul, trying to plan Istanbul, as far as he thinks about Istanbul, and all of them are by DLH. We strongly criticized this in meetings but it was included in the new plan.

]]Containing areas according to TOKİ]

]]]]

The other criticism related to the housing areas. The new space around 11 thousand hectar opens to develop. We’ve been observing this here; we're seeing that the new residential areas of this 11 thousand hectares are guided by the project that has been made in the past years. If TOKİ and KIPTAŞ has gone to where the Environmental Layout Plan has also accepted them as a data if pushed to develop residential projects in them. Some of these projects are wrong, some of them are court. They can cancel, cancel. There are many examples of this in Istanbul, and there are so many places that are invalid legal. Is a plan in the Environmental Layout Plan scale accurate to the choice of space without digging them? [

Who will discuss the cons?]]

]]

Finally I want to pay attention to timing. We say that the Environmental Layout Plan is the constitution of this city. They say they do with this tutorial. The City of Istanbul is not correct even if everything is correct in this plan. It was approved in the final meeting here. Will the plan be opened, we push to appeal, who will discuss? The municipality will discuss from the choice. If the difficulties will discuss the next selection of the plan from the selection. What will you think according to what, what will it refuse?

] Compatible (Mimars Chamber, Urbanization Planning Committee Act)]]

]

]] We did not see the last version

]] [

The last plan that has not enough enough our hands but we reviewed the previous version of a month. There may be a two minor changes in the current form, we don’t know exactly what these changes are, but this plan doesn’t change our idea about the entire.

Arkeological field college!]]

We did not have anything that changes under the headers in 2006. A university area was included in the east and west in the first place. These are removed from the bottom of the drinking water. [

A new business center was put in the bottom of the seaside in a 2-B area in the country. Smallçekmece Basin, which is the first place in the first place, had the decision to carry out Istanbul University in Istanbul. This is very important place in both ecologically and there are very important places in the region. Find here, like those in the Yenikapı, will light in the neolithic era of Istanbul and after. In addition to the old plan, a new university area is located in this area.

]] If the center said what!]]]

When you look at the plan report, it is wrong to shape Istanbul with plans up to some of the lower scales, parcels, and for him, we plan from the ball." The project is located in the center of Istanbul, the competition projects in Küçükçekmece, the port in Zeytinburnu, the Haydarpaşa project, the process of Tuesday Project, the lower-scale projects such as the finance center project in Ataşehir where Prime Minister was linguized. [

]]] airport ]]

There was no airport in the report for two years ago and such a need was not passed. In the report, only the expansion of the second airport and the draft of the two airports was distributed. The third airport is located in the new plan. The Minister had announced, so the decision has given itself. in the middle of the large area, which will be preserved in the agricultural character of the airport. As a result, if the central government said, they were born in the unexclusive plan. [

It is to say that the timing selects

]]

Up to the plan of the selected timing for approval is also very controversial. A new alliance and new people will come. It was necessary to release new management and new assembly. It is possible to explain the alelace as Sanki misses goods from fire to good faith. [[

Eylem Tuncaelli (President of the Chamber of Environmental Engineers Istanbul Branch)]

]]The most sensitive issue

The strategies that lead to planning are more and more migration than the city. The aim of shifting to other parts of Turkey by removing business centers and industry from the city was planned to close to coasts and natural water environments in Istanbul. It is also seen that the wolfs are reviewed. [

The Küçükçekmece Lake Basin in line with the strategies determined in the planning was removed from the street. The absolute, short and long-distance protection tape that protects the lacquer and streams is lifted, and the turquoise industry with approximately 400 endemic (specific to this region) and angled into the occupational. In other places (Handmade, Ömerli, Terkos Plateau) the absolute protection zone was designed to plan but 2-B areas in the forestry areas surround by the border of the mosque was determined by the determination. 2-B area definition in the turquoise limits and/or forestry areas shows that the accesss on the plan to open the construction of these regions will be mentioned and the turquoise will appear under the obstacles. [[

As a result, the criticisms that we have expressed were ignored, especially the decisions that lead to the destruction of water raftings and returns

]

]The answer of the Municipal]

The Istanbul Metropolitan Municipality of Istanbul Metropolitan Municipality on the new plan that has been announced in a written statement to NTVMSNBC and abroad brought by the plan and responded to criticism. [

[

]]]] [

This plan was created in person by Istanbul Metropolitan Municipality City Planning Directorate, court decisions and related leaders.

2006 with the Law No. 5538, the municipal limits are shown that the authorization to Plan the Provincial Environmental Layout in Metropolitan Affairs, which are the border of the province is only used by Metropolitan arbitration. According to Law No. 5538, 1/100.000 scale Environmental Layout Plan is in Istanbul Metropolitan Municipality. [

New plan more guard

The plan has much more responsive to the environment and agricultural lands. With this plan, the ratio of protected agricultural lands is increased.

The plan that freezes the natural resources with protective strategies, for example, the logistic area in Gümüşyaka, the onlyno-park in Silivri and the onlynopark areas in Ağva have been given maximum sensitivity to the plan by condoming agricultural lands. [

[

In2006, about 15,000 hectar is protected by this plan according to the Environmental Layout Plan adopted by the Metropolitan Municipal Assembly. [

The inventions to the first plan was taken into account the Top Scale Plans in the Environment Province (Trakya, Kocaeli), IX. Development Plan, works like the OECD Report, reviews from our corporate opinion article and difficulties on the Sector of Agriculture, Industry and Services, which were built by the Istanbul Metropolitan Municipality, and 1/100.000 scale Provincial Environment Layout Plan was revised by our City Planning Directorate in this direction.

]]We have received views of those]]

]

23.06.2008, 08.07.2008 and 14.08.2008 are organized meetings with the authorization who represents all the Chambers. The presentation was made to the Room Abuses in these meetings and the information about the plan was made. [

A voice or visual records are available for the meetings we made based on the rooms of the units. [

]]] compliance with Turkey]

]]] [email protected]

The European Corine standard was prescribed about the maximum 20 different of types of lejand substance, which is beyond the structure of this macro thought, taking into account the scale of the metropolis field, is much more micro plan to meet Turkey standards.

Oral areas or any decision on the destruction of water rafting is noted. Agricultural fields, forest areas and water slides are under absolute protection. [

[

As intended for the demands of TOKİ and KIPTAŞ, it is necessary to open any housing on other plans with this plan. [

]3. The airport is not guaranteed]]

]

The third airport, but the recommended 1.5 million population in Silivri is desantrlize to that point, after filling the existing second airport renovation, there may be traced surveys.

[email protected]

This plan was created by Mayor of Istanbul Metropolitan Municipality Mr. Kadir Topbaş in the bossage of the Mayor of Istanbul Metropolitan Municipality, with method based on documents, consultants and NGOs meetings.

[email protected]

Source: News